Three 80 m3 (40,000 bf) kilns in a pre-cast concrete construction.
Back side of pre-cast construction.
These kilns have a heat recovery system.
|
|
|
|
![]()
WOODDRYER SYSTEM, http://www.njc-usa.com/wooddy/
WOODDRYER SYSTEM, EMAIL: wooddy@njc-usa.com